When does a spec pay off? We looked at 1,476 of our own pull requests
SpecWeave asks agents to plan work as an increment: a spec.md with acceptance criteria and tasks. We build SpecWeave, SpecWithCode and Verified Skill with it, so we asked a plain question of our own last four weeks: does planning make the work longer, bigger or more complicated?
The data
From 6 October to 3 November 2026: 1,476 merged pull requests across five repositories, 1,142 SpecWithCode threads and 1,445 Claude Code sessions. About a third of the pull requests (515, 35%) were tied to an increment. The rest were done directly. This is one team's history, not a controlled experiment.
Small changes: about the same
Under 300 changed lines, increment-backed and direct pull requests stayed open about as long (median 0.2 to 0.6 hours) and needed follow-up fixes about as often. Threads that shipped one such pull request used similar active time and output tokens, though they exchanged more messages.
Large changes: about twice the messages
Above 1,000 changed lines, increment-backed pull requests stayed open 1.7 to 2.6 times longer. Threads that shipped exactly one took about twice the messages and output tokens. Follow-up fixes were as common or less common (24% against 24%, and 28% against 37% for the largest). Harder work may be what gets planned, so this is an association, not a measured cost.
Task status came late
A typical increment was one 52-line spec with five tasks. But in 16 of 20 sampled increments, at least one task was marked done only after the pull request had merged.
What we changed
We did not measure what continuity is worth. It is still why we plan: Codex picks up where Claude Code stopped, a second account continues, another machine runs the next task. So SpecWeave's instructions now say:
- Skip the increment for one pull request under about 300 changed lines, a follow-up fix, a UI tweak or an investigation:
specweave small-fix "<why>". - Plan multi-day work, cross-platform changes, auth, payments, migrations and work another tool or machine will pick up. These win over size.
- Record tasks as you finish them, not after the merge.
The tables, the method and the caveats are in When to plan an increment.